This being my first post I would like to introduce myself. I am a DIY'er with an obsession with tools. I buy tools first, then decide what I am going to do with them. I am currently a student studying construction management. Whenever I get a chance I am always building or fixing something. Here are some sidewalks I recently did. This is the first time I have ever worked with concrete. I spent hours on youtube learning tricks and discovering what tools I would need. I poured the sidewalks by the house first, 7 yd pour . And I poured the pads behind the barn another day, 8yd pour. I probably could have poured them both the same day but being my first time I decided to take it slow. Let me know what you think!