Im currently renovating the second floor of a duplex for the owner.Its a old building so theres lots that needs doing but heres a rundown of some of the things partition living room to add another bedroom, remove popcorn ceiling and skim coat, redo all electrical , recessed lights, plumbing, tile, paint and more, Hopefully we can be done with the majority of it all in about 2 weeks. Ill keep posting pics as the work goes

Link to comment
Share on other sites

Two weeks is doable with the right crew. Looking at the pictures is that horsehair plaster.  I hate tearing that stuff out and blending it back in. From what I can see you guys are on a roll good luck and lets hope the owner does not come up with any change orders.

Link to comment
Share on other sites

Two weeks is doable with the right crew. Looking at the pictures is that horsehair plaster.  I hate tearing that stuff out and blending it back in. From what I can see you guys are on a roll good luck and lets hope the owner does not come up with any change orders.

Horse hair? Never seen that before but it is cement plaster, blending it is not so bad I've done it so much all the old houses around Beverly hills and Hollywood area are like that, and i do feel change orders coming.

  • Like 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Member Statistics

    18,156
    Total Members
    6,555
    Most Online
    Ballen1114
    Newest Member
    Ballen1114
    Joined
×
×
  • Create New...