Jump to content

MikeyB

Members
  • Posts

    1,294
  • Joined

  • Last visited

Posts posted by MikeyB

  1. Working on priming and painting the past couple of days, have to pick up the moulding this weekend and start working on that. Got a few more pics of some extra work I came across while working on this project.

    I was able to remove a couple of the original hot water convectors and replace with some hot water baseboard for the heat, added a couple of new outlets, and in the second pic I tool advantage of the wall being open and installed a length of 1 1/2" plastic electrical conduit for future wire runs from the attic to the basement.

  2. I work with my Dad as much as I can, you will always see him using his Yankee Screwdriver, hand/Block plane, etc, etc I had to turn him on to pneumatic nail guns about 15 years ago, he was still installing moulding by hand, setting his nails with his nail set. He still has a ton of old tools, power and hand.. Some of them you just can't beat the quality.

×
×
  • Create New...