Scope of work, change rotted down pipe wire was exposed, install low voltage bonding bridge, install water ground with bonding jumper for previous water softener. Dig a huge 4 foot deep hole which is not easy here in Florida. New number 6 ground wire, replace second ground rod which was rotted out but looks like someone cheated and just used a small piece code is two 8 foot ground rods spaced at 6 feet apart. Pull permits and call in for inspections there is 3 inspections needed for this little job.