Jump to content

Electrical Work this Morning


Recommended Posts

Scope of work, change rotted down pipe wire was exposed, install low voltage bonding bridge, install water ground with bonding jumper for previous water softener. Dig a huge 4 foot deep hole which is not easy here in Florida. New number 6 ground wire, replace second ground rod which was rotted out but looks like someone cheated and just used a small piece code is two 8 foot ground rods spaced at 6 feet apart. Pull permits and call in for inspections there is 3 inspections needed for this little job.  

 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Member Statistics

    18,156
    Total Members
    6,555
    Most Online
    Ballen1114
    Newest Member
    Ballen1114
    Joined
×
×
  • Create New...