Jump to content

This Old Cabin


EEtwidget

Recommended Posts

  • 3 weeks later...
  • 3 weeks later...

I kind of dropped the ball on this thread. We finished the gas line, reroute and replaced with 3/4". The earth is full of very large boulders, digging here sucks! Added a ledger and repaired shingles. Deck building is slow as winter + busy schedules makes it hard to find a window. We tossed the remainder of the build to a local contractor who lives down the street. Lots of other projects and the back deck needs replacing in the summer.  

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Member Statistics

    18,198
    Total Members
    6,555
    Most Online
    tharunjohar46
    Newest Member
    tharunjohar46
    Joined
×
×
  • Create New...