Jump to content

New bathroom completed in 5 days


Baza2406

Recommended Posts

Thanks Chris the tiling was the easy part. The existing tiles were stuck on to sand/cement render and were a nightmare to remove. Took 2 of us a full day with kangos to remove them, I then had to replanted the walls to straighten them out. New 2.0 bar pump installed to run the shower. Was a lot of work but the customer delighted with the finished product.

Link to comment
Share on other sites

house not in a city it's about 20 miles from the nearest town. That's shower doesn't run off the mains supply. Cold from the storage tank and hot from the cylinder. The pressure in the house is very poor and the customer wanted power shower pressure. 2.0 bar Grundfos pump installed in the hot press.

  • Like 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Member Statistics

    18,195
    Total Members
    6,555
    Most Online
    mattyuk
    Newest Member
    mattyuk
    Joined
×
×
  • Create New...