Jump to content

1/2 Bath Remodel


djslater

Recommended Posts

  • 1 month later...

Well, the green turlet broke....I had it outside, and all the freezing/unfreezing must have done it.

 

Anyway, I have the 1/2 bath nearing completion. New drywall up, painted, tile floor cleaned, new vanity/sink combo installed. I just need to do the trim work, install the toilet, and the hardware on the walls.

 

WITH THE EXCEPTION, of the leaks I'm having in the vanity...lol. I've had a few drips hear, and there. I've fixed them with teflon tape, new gaskets, and tightening. All with the exception of the last one at the back end of the P-Trap. I'll post pics, and update on the leak soon.

Link to comment
Share on other sites

  • 3 weeks later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Member Statistics

    18,265
    Total Members
    6,555
    Most Online
    Fill
    Newest Member
    Fill
    Joined
×
×
  • Create New...